This ambitious project is proposed at Palitana with the 90-meter clear span of the dome. We are doing a feasibility study for the main dome structure. Meanwhile, the smaller dome with a span of 12 meters is under construction. Eminent hydraulic lime and Marble stones are used for the foundation and superstructure.
3D view of proposed dome
Construction of foundation